Design

Applying innovative construction methods
 50% cheaper and faster
while retaining high quality

Construction methods; steel structure with prefabricated panels.

The construction of the homes (senior, community, nursing home or student home) is based upon a building method with prefabricated sections. The three and five storey buildings have a steel core skeleton. The steel core is made of hot rolled high tensile steel and is galvanised to prevent corrosion (of extra importance in coastal areas) and additionally protected with fire retardant paint. The core will not require any welding due to the use of high tensile bolts. Floors, the façade, and inside walls, will be constructed using precast panels. The panels are made from autoclaved aerated concrete and have unique properties: lightweight, fast and easy installation, unique thermal insulation, high acoustic insulation and cost-effective pricing. The glass roof will also be completely prefabricated in the factory and will be lifted on top of the building on-site. The use of the highest quality aluminium window frames and doors supports this approach.

Energy neutral approach

Pulchram will strive to make the building as energy neutral as possible. The wall and roof panels, window and window frames support the energy neutral goal. Because of the high thermal insulation, energy consumption will be low. The roof will be fitted with a maximum number of PV panels, and if possible space adjacent to the building, will also be used to make the building energy neutral. If the building plot does not allow any ground-mounted PV panels, Pulchram will strive to make the building as energy neutral as possible.
In addition to the deployment of a large set of PV panels, the use of air-to-air heat/cooling pumps and underfloor heating on the ground floor, will provide a solid base for an economical and highly efficient heating/cooling system, ensuring the buildings’ low carbon footprint.


Fast building method beating local market standards

The buildings are prepared in a factory, shipped from the factory and transported to the building plot. Expected building times will be around five to seven months. The building will be fitted with the HVAC and electrical/mechanical installations on-site. Prior to erecting the prefabricated structure, the plots will be prepared with a suitable building foundation. We anticipate situations where the building plot needs urbanization facilities (roads, power, sewerage, etc.). Pulchram has included this in the project plan and financial planning.


High quality fit out ensuring a well being and luxury touch

Our suppliers are known for the best value for money and high quality capabilities. We want to make sure you not only benefit from a well thermal insulated and sturdy building, you want to also enjoy nice quality touch when you open the door, touch the window or prepare a lunch in your kitchen..

Share by: